Begutachtete Zeitschriftenartikel

  • Ewen, H., Mönch, L., Ehm, H., Ponsignon, T., Fowler, J. W., Forstner, L. (2017):
    A Testbed for Simulating Semiconductor Supply Chains. IEEE Transactions on Semiconductor Manufacturing, 30(3), 293-305.
  • Sobeyko, O., Mönch, L. (2017):
    Integrated Process Planning and Scheduling for Large-Scale Flexible Job Shops Using Metaheuristics. International Journal of Production Research, 55(2), 392-409.
  • Kacar, N. B., Mönch, L., Uzsoy, R. (2016):
    Modeling Cycle Times in Production Planning Models for Wafer Fabrication. IEEE Transactions on Semiconductor Manufacturing, 29(2), 153-167.
  • Ziarnetzky, T., Mönch, L. (2016):
    Incorporating Engineering Process Improvement Activities into Production Planning Formulations Using a Large-Scale Wafer Fab Model. International Journal of Production Research, 54(21), 6416-6435.
  • Ramacher, R., Mönch, L. (2016):
    An Automated Negotiation Approach to Solve Single Machine Scheduling Problems With Interfering Job Sets. Computers & Industrial Engineering, 99, 318-329.
  • Sobeyko, O., Mönch, L. (2016):
    Heuristic Approaches for Scheduling Jobs in Large-scale Flexible Job Shops. Computers & Operations Research, 68, 97-109.
  • Fowler, J. W., Mönch, L., Ponsignon, T. (2015):
    Discrete-event Simulation for Semiconductor Wafer Fabrication Facilities: A Tutorial. International Journal of Industrial Engineering: Theory, Applications, and Practice, 22(5), 661-682.
  • Sobeyko, O., Mönch, L. (2015):
    Grouping Genetic Algorithms for Solving Single Ma­chine Multiple Orders per Job Scheduling Problems. Annals of Operations Research, 235(1), 709-739.
  • Ramacher, R., Mönch, L. (2015):
    Service Selection with Runtime Aspects: A Hierarchical Approach. IEEE Transactions on Services Computing, 8(3), 481-493.
  • Bortfeldt, A., Hahn, T., Männel, D., Mönch, L. (2015):
    Hybrid Algorithms for the Vehicle Routing Problem with Clustered Backhauls and 3D Loading Constraints. European Journal of Operational Research, 243, 82-86.
  • Bilyk, A., Mönch, L., Almeder, C. (2014):
    Scheduling Jobs with Ready Times and Precedence Constraints on Parallel Batch Machines Using Metaheuristics. Computers & Industrial Engineering, 78, 175-185.
  • Ewen, H., Mönch, L. (2014):
    A Simulation-based Framework to Schedule Surgeries in an Eye Hospital, IIE Transactions on Healthcare Systems Engineering, 4, 191-218.
  • Shen, L., Mönch, L., Buscher, U. (2014):
    Simultaneous and Iterative Approach for Parallel Machine Scheduling with Sequence Dependent Family Setups. Journal of Scheduling, 17(5), 471-487.
  • Ramacher, R., Mönch, L. (2014):
    Robust Multi-criteria Service Composition in Information Systems. Business & Information Systems Engineering (WIRTSCHAFTS­INFORMATIK), 6(3), 141-151.
  • Ponsignon, T., Mönch, L. (2014):
    Simulation-based Performance Assessment of Mas­ter Planning Approaches in Semiconductor Manufacturing. OME­GA, 4(6), 21-35.
  • Sprenger, R., Mönch, L. (2014):
    A Decision Support System for Cooperative Transportation Planning: Design, Implementation and Performance Assessment. Expert Systems with Applications, 41, 5125-5138.
  • Fink, A., Kliewer, N., Mattfeld, D. C., Mönch, L., Rothlauf, F., Schryen, G., Suhl, L., Voß, S. (2014):
    Model-based Decision Support in Manufacturing and Service Networks. Business & Information Systems Engineering (WIRTSCHAFTS­IN­FORMATIK), 6(1), 17-24.
  • Ramacher, R., Mönch, L. (2013):
    Time-sensitive Service Reconfiguration: A Model-based Approach. International Journal of Business Process Integration and Management, 6(4), 312-325.
  • Kacar, N. B., Mönch, L., Uzsoy, R. (2013):
    Planning Wafer Starts using Nonlinear Clearing Functions: a Large-Scale Experiment. IEEE Transactions on Semiconductor Manufacturing, 26(4), 602-612.
  • Shen, L., Mönch, L., Buscher, U. (2013):
    An Iterative Approach for the Serial Batching Problem with Parallel Machines and Job Families. Annals of Operations Research, 206(1), 425-448.
  • Dauzère-Pérès, S., Mönch, L. (2013):
    Scheduling Jobs on a Single Batch Processing Machine with Incompatible Job Families and Total Weighted Number of Tardy Jobs Objective. Computers & Operations Research, 40(5), 1224-1233.
  • Sprenger, R., Mönch, L. (2012):
    A Methodology to Solve Large-Scale Cooperative Tranportation Planning Problems. European Journal of Operational Research, 223, 626-636.
  • Driessel, R., Mönch, L. (2012):
    An Integrated Scheduling and Material Handling Approach for Complex Job Shops: A Computational Study. International Journal of Production Research, 50(20), 5966-5985.
  • Bilyk, A., Mönch, L. (2012):
    A Variable Neighborhood Search Approach for Planning and Scheduling of Jobs on Unrelated Parallel Machines. Journal of Intelligent Manufacturing, 23(5), 1621-1635.
  • Ponsignon, T., Mönch, L. (2012):
    Heuristic Approaches for Master Planning in Semiconductor Manufacturing. Computers & Operations Research, 39(3), 479-491.
  • Heyne, D., Mönch, L. (2011):
    An Agent-based Planning Approach within the Framework of Distributed Hierarchical Enterprise Management. Journal of Management Control (ehemals Zeitschrift für Planung und Unternehmenssteuerung), 22(2), 205-236.
  • Mönch, L., Lendermann, P., McGinnis, L., Schirrmann, A. (2011):
    A Survey of Challenges in Modeling and Decision-Making in Discrete Event Logistics Systems. Computers in Industry, 62(6), 557-567.
  • Almeder, C., Mönch, L. (2011):
    Metaheuristics for Scheduling Jobs with Incompatible Families on Parallel Batch Machines. Journal of the Operational Research Society,  62, 2083-2096.
  • Mönch, L., Fowler, J. W., Dauzère-Pérès, S., Mason, S. J.,  Rose, O. (2011):
    A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6), 583-599.
  • Mönch, L., Zimmermann, J., Mason, S., Fowler, J.W. (2011):
    Multiple Orders per Job Formation and Release Strategies in Large Scale Wafer Fabs: A Simulation Study. Journal of Simulation, 5(1), 25-43.
  • Chien, C.-F., Dauzère-Pérès, S., Ehm, H., Fowler, J. W., Jiang, Z., Krishnaswamy, S., Mönch, L., Uzsoy, R. (2011):
    Modeling and Analysis of Semiconductor Manufacturing in a Shrinking World: Challenges and Successes. European Journal of Industrial Engineering, 5(3), 254-271.
  • Driessel, R., Mönch, L. (2011):
    Variable Neighborhood Search for Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times, Precedence Constraints, and Ready Times. Computers & Industrial Engineering, 61, 336-345.
  • Mönch, L., Zimmermann, J. (2011):
    A Computational Study of a Shifting Bottleneck Heuristic for Multi-Product Complex Job Shops. Production Planning & Control, 22(1), 25-40.
  • Lendermann, P., McGinnis, L., Mönch, L., Schirrmann, A. (2010):
    Dagstuhl Manifesto Grand Challenges for Discrete Event Logistics Systems. Informatik Spektrum, 33(6), 663-668.
  • Jampani, J., Pohl, E. A., Mason, S., Mönch, L. (2010):
    Integrated Heuristics for Scheduling Multiple Order Jobs in a Complex Job Shop. International Journal of Metaheuristics, 1(2), 158-180.
  • Jain, S., Mönch, L., Jänich, T., Lendermann, P. (2010):
    Infrastructure for Model Based Production Scheduling. International Journal of Industrial and Systems Engineering, 6(4), 441-461.
  • Hornung, A., Mönch, L. (2008):
    Heuristic Approaches for Determining Minimum Cost Delivery Quantities in Supply Chains. European Journal of Industrial Engineering, 2(4), 377-400.
  • Mönch, L. (2007):
    Simulation-Based Benchmarking of Production Control Schemes for Complex Manufacturing Systems. Control Engineering Practice, 15, 1381-1393.
  • Mönch, L., Zimmermann, J. (2007):
    Simulation-based Assessment of Machine Criticality Measures for a Shifting Bottleneck Scheduling Approach in Complex Manufacturing Systems. Computers in Industry, 58(7), 644-655.
  • Mönch, L., Unbehaun, R. (2007):
    Decomposition Heuristics for Minimizing Earliness-Tardiness on Parallel Burn-In Ovens with a Common Due Date. Computers & Operations Research, 34(11), 3380-3396.
  • Mönch, L., Schabacker, R., Pabst, D., Fowler, J. W. (2007):
    Genetic Algorithm-Based Subproblem Solution Procedures for a Modified Shifting Bottleneck Heuristic for Complex Job Shops. European Journal of Operational Research, 177(3), 2100-2118.
  • Mönch, L., Stehli, M., Zimmermann, J., Habenicht, I. (2006):
    The FABMAS Multi-Agent-System Prototype for Production Control of Waferfabs: Design, Implementation, and Performance Assessment. Production Planning & Control, 17(7), 701-716.
  • Mönch, L. (2006):
    Autonome und kooperative Steuerung komplexer Produktionsprozesse mit Multi-Agenten-Systemen. WIRTSCHAFTSINFORMATIK, 48(2), 107-119.
  • Mönch, L., Zimmermann, J., Otto, P. (2006):
    Machine Learning Techniques for Scheduling Jobs with Incompatible Families and Unequal Ready Times on Parallel Batch Machines. Journal of Engineering Applications of Artificial Intelligence, 19(3), 235-245.
  • Mönch, L., Stehli, M. (2006):
    ManufAG: A Multi-Agent-System Framework for Production Control of Complex Manufacturing Systems. Information Systems and e-Business Management, 4(2), 159-185.
  • Mönch, L., Unbehaun, R., Choung, Y. I. (2006):
    Minimizing Earliness and Tardiness on a Single Burn-in Oven with a Common Due Date and a Maximum Available Tardiness Constraint. OR Spectrum, 28(2), 177-198.
  • Mönch, L., Drießel, R. (2005):
    A Distributed Shifting Bottleneck Heuristic for Complex Job Shops. Computers & Industrial Engineering, (49), 673-680.
  • Habenicht, I., Mönch, L. (2005):
    Simulation-based Performance Assessment of Batching Strategies in Multi-Product Semiconductor Wafer Fabrication Facilities. International Journal of SIMULATION: Systems, Science & Technology, 6(5), 3-13.
  • Mönch, L., Balasubramanian, H., Fowler, J. W., Pfund, M. E. (2005):
    Heuristic Scheduling of Jobs on Parallel Batch Machines with Incompatible Job Families and Unequal Ready Times. Computers & Operations Research, 32, 2731-2750.
  • Mönch, L. (2004):
    Scheduling-Framework für Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK, 46(6), 470-480.
  • Balasubramanian, H., Mönch, L., Fowler, J. W., Pfund, M. E. (2004):
    Genetic Algorithm Based Scheduling of Parallel Batch Machines with Incompatible Job Families to Minimize Total Weighted Tardiness. International Journal of Production Research, 42(8), 1621-1638.
  • Mönch, L., Stehli, M. (2003):
    Simulationsbasierte Leistungsbewertung von Systemen der Verteilten Künstlichen Intelligenz für die Produktionssteuerung. Zeitschrift für Künstliche Intelligenz, 4/03, 43-49.
  • Mönch, L., Rose, O., Sturm, R. (2003):
    A Simulation Framework for the Performance Assessment of Shop-Floor Control Systems. SIMULATION: Transactions of the Society for Modeling and Simulation International, 79/3, 163-170.
  • Chapko, R., Kress, R., Mönch, L. (2000):
    On the Numerical Solution of a Hypersingular Integral Equation for Elastic Scattering from a Planar Crack. IMA Journal of Numerical Analysis. 20, 601-619.
  • Mönch, L. (1997):
    On the Inverse Acoustic Scattering Problem by an Open Arc: the Sound-Hard Case. Inverse Problems, 13, 1379-1392.
  • Mönch, L. (1996):
    A Newton Method for Solving the Inverse Scattering Problem for a Sound-Hard Obstacle. Inverse Problems, 12, 309-323.
  • Mönch, L. (1996):
    On the Numerical Solution of the Direct Scattering Problem for an Open Sound-Hard Arc. Journal of Computational and Applied Mathematics, 71, 343-356.

<< zurück